SOIL TESTING LABORATORY
Poultry Laboratory
Built: 1919
Addition: 1956
Architect: 1919 Proudfoot Bird & Rawson
Contractor: 1919 Supt. of Buildings & Grounds, 1956 James Thompson & Sons
The first unit (east section) of this building was erected in 1919 as a poultry laboratory. It was 20’ x 80’ with basement and first floor, of brick construction. It’s cost was $5836.33. It had first been requested in 1910.1
The poultry laboratory continued in use until 1965 when it moved to Kildee Hall.
The Soil Testing Laboratory addition on the west end of the building was built in 1956-57.
Soil Testing had been housed in the old Forage Crops Lab (see North Studio) and on the upper level of the Poultry Lab before the addition was completed, and has used the entire building since 1956.
-
Biennial Report, 1908-10 ↩︎